当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:由于上次多出的只有一托货,12月15日发的货两个40尺柜装不下,所以我把12月份发货的产品有两托提前发了。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
由于上次多出的只有一托货,12月15日发的货两个40尺柜装不下,所以我把12月份发货的产品有两托提前发了。
问题补充:

  • 匿名
2013-05-23 12:21:38
Because only one last extra care goods, issued December 15, two 40-foot cargo container fit, so I shipped the product in December before the two Thoth made.
  • 匿名
2013-05-23 12:23:18
Because there is only one of the last more than 15 December, and the volume of the two 40 -foot container is not under 12, so I am the shipment of goods in the two and advance.
  • 匿名
2013-05-23 12:24:58
Because previous time as soon as only then holds the goods, the goods two 40 foot cabinets which on December 15 sends not to be able to install, therefore I deliver goods December the product had two holds to send ahead of time.
  • 匿名
2013-05-23 12:26:38
Due to last only one more support, and on December 15 of the total, the two 40 ' full container load, and so I have two supporting product shipped in December were made in advance.
  • 匿名
2013-05-23 12:28:18
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭