|
关注:1
2013-05-23 12:21
求翻译:主要阐述防水材料概述,施工前的准备工作,施工过程的质量控制,防水施工的重点项目以及质量检查等问题。是什么意思? 待解决
悬赏分:1
- 离问题结束还有
主要阐述防水材料概述,施工前的准备工作,施工过程的质量控制,防水施工的重点项目以及质量检查等问题。
问题补充: |
|
2013-05-23 12:21:38
Describes an overview of the major waterproofing materials, pre-construction preparation, construction process, quality control, construction of key projects and water quality checks and other issues.
|
|
2013-05-23 12:23:18
waterproof materials focuses on the preparation of the outline, pre-construction and construction process of quality control, waterproof construction project as well as the focus on issues such as quality control inspection.
|
|
2013-05-23 12:24:58
Main elaboration waterproofing material outline, before construction preparatory work, construction process quality control, waterproof questions and so on construction key project as well as quality testing.
|
|
2013-05-23 12:26:38
Mainly on waterproof material overview, pre-construction preparations, process quality control in construction, waterproof construction of key projects, and quality checks, and so on.
|
|
2013-05-23 12:28:18
Mainly explain the waterproof material summary, the preparation before constructing, the quality control of the construction course, waterproof question of key item and quality examination,etc. that constructs.
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区