求翻译:3. Rack Termination & Relocation schedule & arrangement: existing they have MPLS port, UTM, internet port patched to the panel at (E02) terminated rack. So, please advise the procedures for relocating the E02 existing cross-connect cables, UTM, to the other existing racks. Linmark will assign colleagues to follow 是什么意思?

待解决 悬赏分:1 - 离问题结束还有
3. Rack Termination & Relocation schedule & arrangement: existing they have MPLS port, UTM, internet port patched to the panel at (E02) terminated rack. So, please advise the procedures for relocating the E02 existing cross-connect cables, UTM, to the other existing racks. Linmark will assign colleagues to follow
问题补充:

  • 匿名
2013-05-23 12:21:38
3。机架终止及搬迁时间表及安排:现有的MPLS端口,UTM,上网端口补丁(E02)终止机架面板。所以,请告知搬迁现有的E02,交叉连接电缆,UTM,其他现有的机架的程序。林麦将分配给同事跟进这一天你的指引。
  • 匿名
2013-05-23 12:23:18
  • 匿名
2013-05-23 12:24:58
  • 匿名
2013-05-23 12:26:38
3.机架终止科技搬迁计划科技安排: 现有他们有修补到面板 (E02) 在终止机架上的 MPLS 端口,UTM,互联网端口。所以,请告知交叉连接电缆,UTM,%E
  • 匿名
2013-05-23 12:28:18
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭