当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:当操作工用针在生产过程中折断损坏或不能满足生产要求时,必须凭断针及所有断残部分或旧针向车间主任换取新针是什么意思?

待解决 悬赏分:1 - 离问题结束还有
当操作工用针在生产过程中折断损坏或不能满足生产要求时,必须凭断针及所有断残部分或旧针向车间主任换取新针
问题补充:

  • 匿名
2013-05-23 12:21:38
When the operator with a broken needle in the production process damage or can not meet production requirements must be off the residue with needle and some or all of the old needles for new needles to the Workshop Director
  • 匿名
2013-05-23 12:23:18
When operator with a pin in the process of production cannot be broken or damaged when production requirements must be met by virtue of the needles and all the residues or needle to needle exchange for a new director of the plant
  • 匿名
2013-05-23 12:24:58
When the operator breaks off with the needle when the production process the damage or cannot satisfy the production request, must depend on breaks the needle and all breaks remnant partial or the old needles to workshop director receives in exchange for the new needle
  • 匿名
2013-05-23 12:26:38
When broken operatives in the production process with a needle when damaged or does not meet the production requirements, must be broken and all the broken part or remnant of the old needle Workshop Director for a new PIN
  • 匿名
2013-05-23 12:28:18
, must gain the new needle to the workshop director by disconnected stitch and all disconnected incomplete parts or old needles
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭