当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:1. In sheet 2 & sheet 15, level 7.85 to 5.5 m section in the drawing is the backfill layer which use 1:1 slope. But this description is not completely exact, we suggest using a slope with tangent l : 1 for the backfill area excavation, however the bedrock area excavation should in accord with the requirement, for slo是什么意思?

待解决 悬赏分:1 - 离问题结束还有
1. In sheet 2 & sheet 15, level 7.85 to 5.5 m section in the drawing is the backfill layer which use 1:1 slope. But this description is not completely exact, we suggest using a slope with tangent l : 1 for the backfill area excavation, however the bedrock area excavation should in accord with the requirement, for slo
问题补充:

  • 匿名
2013-05-23 12:21:38
1。在表2及表15,水平7.85至5.5米的绘图部分使用1:1的斜坡回填层。但这样的描述是不完全确切,我们建议使用与切线升的斜率:1回填面积开挖,基岩面积开挖应符合要求,绘图指令的斜坡。
  • 匿名
2013-05-23 12:23:18
1. 在資產負債表資產負債表2及15,一级7.85至5.5M节是在绘画的回填层,使用1:1斜坡。 但这一描述不完全准确,我们建议用一个斜坡,正切L:1回填地区的挖掘,但地区挖掘的基石应当在符合该规定,提供维修斜坡的指示。
  • 匿名
2013-05-23 12:24:58
  • 匿名
2013-05-23 12:26:38
  • 匿名
2013-05-23 12:28:18
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭