|
关注:1
2013-05-23 12:21
求翻译:因此有如下可能将有的调整,未包含在此时施工图中是什么意思? 待解决
悬赏分:1
- 离问题结束还有
因此有如下可能将有的调整,未包含在此时施工图中
问题补充: |
|
2013-05-23 12:21:38
Therefore, the following may be some adjustment, not included in construction plans at this time
|
|
2013-05-23 12:23:18
That is why there is the possibility that there will be an adjustment, not included in this time in working drawings
|
|
2013-05-23 12:24:58
Therefore has the adjustment which as follows will possibly have, has not contained in this time construction drawing
|
|
2013-05-23 12:26:38
Therefore has the following possible adjustments, are not included in the construction drawing
|
|
2013-05-23 12:28:18
Therefore has the following possible adjustments, are not included in the construction drawing
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区