当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:5.Where the Solar panels are installed on the roof(on South side),please advice weight,size and mounting details of the solar panels and their covering area so that structural engineer can prepare reinfocement and design fixtures for the solar poanels on the roof. Please provide dimensions of each mounting components a是什么意思?

待解决 悬赏分:1 - 离问题结束还有
5.Where the Solar panels are installed on the roof(on South side),please advice weight,size and mounting details of the solar panels and their covering area so that structural engineer can prepare reinfocement and design fixtures for the solar poanels on the roof. Please provide dimensions of each mounting components a
问题补充:

  • 匿名
2013-05-23 12:21:38
5.Where的太阳能电池板安装在屋顶上(南侧),请使结构工程师准备屋顶上的太阳能poanels reinfocement和设计夹具的意见,重量,尺寸和安装的太阳能电池板,其占地面积的详细信息。请提供每个安装的组件和安全上的屋顶安装propsal尺寸。
  • 匿名
2013-05-23 12:23:18
正在翻译,请等待...
  • 匿名
2013-05-23 12:24:58
5.Where太阳电池板在屋顶(在南侧),请忠告重量、大小和太阳电池板和他们的覆盖物区域的架置细节安装,以便结构工程师在屋顶能准备reinfocement和为太阳poanels设计装置。 为安全登上请提供维度每架置组分和propsal在屋顶。
  • 匿名
2013-05-23 12:26:38
5.凡 (偏南) 在屋顶上安装太阳能电池板,请咨询重量、 尺寸和安装的详细信息的太阳能电池板和其覆盖区这样的结构工程师可以准备在屋顶上的太阳能 poanels 太平湖和设计夹具。请提供每个安装组件和定向意见的尺寸牢固地安装在屋顶上。
  • 匿名
2013-05-23 12:28:18
5 . 太阳电池板在屋顶(在南边上)上安装在哪里,使建议重量,尺寸和固定太阳电池板和他们掩盖的地区的细节满意,以便结构的工程师能准备reinfocement并且在屋顶上为太阳poanels 设计固定设备。请提供每一个把为可靠爬上的组%E
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭