|
关注:1
2013-05-23 12:21
求翻译:安装手具时,应将手具接头垂直插入与主机相连的插孔,必须插入到位听见“咔、咔”两响声时方可。是什么意思?![]() ![]() 安装手具时,应将手具接头垂直插入与主机相连的插孔,必须插入到位听见“咔、咔”两响声时方可。
问题补充: |
|
2013-05-23 12:21:38
When installing hand tools, hand tools should be connected to the host connector straight into the jack, insert the place to be heard "cracking, cracking" sound when only two.
|
|
2013-05-23 12:23:18
Hands should be installed when they will be hand-fitting vertical insertion and hosts the jack, you must insert linked to expel heard "Channels", two beep may be.
|
|
2013-05-23 12:24:58
Installs when the hand has, should the hand have the attachment vertical insertion and the main engine connected jack, must insert the arriving to hear “carbazole, carbazole” time the double-bang firecracker sound only then.
|
|
2013-05-23 12:26:38
When you install the hands should the hand joints straight into the host connected to the Jack must be seated to hear "carbazole and the carbazole" two sound when we can.
|
|
2013-05-23 12:28:18
Install hand have, should have connect insert the jack bondedded to host computer in hand vertically, can when must insert and hear two noises of ", " in place.
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区