当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:However, the effects of regeneration declined in time, probably as a result of irreversible fouling of the pores. At day 220 fluxes could no longer be maintained. Accordingly,on day 237 the membranes were again exchanged.Since the flux capacity of the last configuration was lower, the target HRT was increased to 10h. A是什么意思?

待解决 悬赏分:1 - 离问题结束还有
However, the effects of regeneration declined in time, probably as a result of irreversible fouling of the pores. At day 220 fluxes could no longer be maintained. Accordingly,on day 237 the membranes were again exchanged.Since the flux capacity of the last configuration was lower, the target HRT was increased to 10h. A
问题补充:

  • 匿名
2013-05-23 12:21:38
然而,再生的影响下降的时候,可能作为一个不可逆转的毛孔防污的结果。 220通量在一天再也不能保持。因此,237天膜再次exchanged.Since最后的配置通量的能力较低,目标HRT为增加至10小时。此外,沿膜的速度提高(见表1)。这HRT的可维持,直到一天270.Subsequently,它已增加15小时通量能力下降的结果。对于所有的膜结构,过滤理论的能源消耗约600-750 WM 3处理过的水,当模块正常运作。
  • 匿名
2013-05-23 12:23:18
然而,在时间的影响下降再生,可能是由于防污孔隙的不可逆转的。 在220天通量可已不能再维持下去。 因此,在237天的膜再次被交换了。自去年配置的通量的能力较低,目标是增加HRT为10h。 此外,沿膜的速度提出了(见表1)。
  • 匿名
2013-05-23 12:24:58
然而,及时下降的再生的作用,大概由于不可逆弄脏毛孔。 在天220涨潮能不再被维护。 相应地,在天237膜再被交换了。因为最后配置的涨潮容量是更低的,目标HRT增加到10h。 另外,速度沿膜被上升了(看见表1)。 这HRT在涨潮容量能被维护直到天270.Subsequently,它必须增加到15 h由于一种衰落。 为所有膜配置,当模块适当地,起了作用理论能源消耗为滤清是大约600-750 W.m3被对待的水。
  • 匿名
2013-05-23 12:26:38
不过,再生的影响下降的时间,可能为不可逆的毛孔污垢的结果。在一天不再能保持 220 通量。因此,237 天再次交换膜。最后的配置的通水能力较低,因为目标 HRT 增至 10 h。此外,沿膜速度提出 (见表 1)。可以保留此 HRT 直到天 270.Subsequently,它不得不将增至 15 h 通能力下降的结果。对所有的膜配置,过滤理论能耗是关于 600-750 王惠 3 处理水时,模块工作正常。
  • 匿名
2013-05-23 12:28:18
不过,再生的影响及时下降,或许由于不可逆的毛孔的弄脏。白天220 流不再能被保持。因此,在天237 膜再次被交换。因为最后一个构造的流能力更低,目标HRT被增加到10h。另外,沿着膜的速度被提高(参阅表格1)。这HRT可能被保持直到天270。后来,它必须被由于一次下降动荡不安的能力增加到15 h。对全部膜构造来说,当模件正确地起作用时,过滤的理论的能源消耗是大约600-750 W.m 3 处理水。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭