求翻译:The Contractor shall,on the instructions of the engineer,suspend the progress of the Works or any part thereof for such time and in such manner as the engineer may consider necessary and shall,during such suspension,properly protect and secure the works or such part thereof so far as is necessary in the opinion of engi是什么意思? 待解决
悬赏分:1
- 离问题结束还有
The Contractor shall,on the instructions of the engineer,suspend the progress of the Works or any part thereof for such time and in such manner as the engineer may consider necessary and shall,during such suspension,properly protect and secure the works or such part thereof so far as is necessary in the opinion of engi
问题补充: |
|
2013-05-23 12:21:38
[object Object]
|
|
2013-05-23 12:23:18
承包者应在本指示的工程师、暂停工程的进度或其任何部分就的时间及方式的工程师可能认为必要和应在这种暂停、适当保护和安全的工程或其有关部分而有需要在舆论的工程师。
|
|
2013-05-23 12:24:58
承包商在工程师的指示将,暂停工作或任何部分的进展因此为这样时刻和以作为工程师也许认为必要,并且,在这样悬浮期间,适当地保护并且巩固工作或这样部分的这样方式因此,至于根据工程师的观点是必要的。
|
|
2013-05-23 12:26:38
承建商在工程师的指示,须暂停工程的进度或任何部分作这样的时间和方式,工程师可能认为有必要和须、 该项暂停期间妥善保护和安全工程或其任何部分须就有必要在工程师的意见。
|
|
2013-05-23 12:28:18
|