求翻译:基础施工工艺流程:定位放线→开挖基槽→基土钎探→验槽→独立柱现浇混凝土垫层→独立柱基础钢筋绑扎、支模板、现浇、养护→基础砌筑→基础回填及安装管线预埋→土方回填。是什么意思? 待解决
悬赏分:1
- 离问题结束还有
基础施工工艺流程:定位放线→开挖基槽→基土钎探→验槽→独立柱现浇混凝土垫层→独立柱基础钢筋绑扎、支模板、现浇、养护→基础砌筑→基础回填及安装管线预埋→土方回填。
问题补充: |
|
2013-05-23 12:21:38
Foundation construction process: positioning put foundation trench excavation line → → → base soil drill exploration experience in-situ concrete columns trough → independent → independent columns cushion based steel banding, support templates, in-situ, conservation → → basic masonry foundation backf
|
|
2013-05-23 12:23:18
正在翻译,请等待...
|
|
2013-05-23 12:24:58
Foundation construction technical process: The localization puts the line -> to excavate the foundation trench -> base earth rock drill to search -> examines the trough -> insulated column cast-in-place concrete breaker strip -> independent base of column steel bar to bind, a template
|
|
2013-05-23 12:26:38
Foundation construction process: locating Foundation trench excavation → line → Rod sounding → slots → independent testing of base soil column in-situ concrete cushion → independent column base reinforcement binding, templates, in-situ concrete, masonry conservation → base → base backfill and instal
|
|