求翻译:为保证水泥稳定基层(以下简称基层)质量加快基层施工进度,为全线基层施工提供质量控制依据和可行性施工方案,我项目部按照上级批示精神,根据我标段实际情况,在K358+500~K358+700右半幅进行了试验施工。通过本次试验段的施工试验,已基本掌握了水泥稳定砂砾基层质量控制要点、施工方法和工艺,具备了进行全线基层施工的条件。现将试验施工情况总结如下是什么意思? 待解决
悬赏分:1
- 离问题结束还有
为保证水泥稳定基层(以下简称基层)质量加快基层施工进度,为全线基层施工提供质量控制依据和可行性施工方案,我项目部按照上级批示精神,根据我标段实际情况,在K358+500~K358+700右半幅进行了试验施工。通过本次试验段的施工试验,已基本掌握了水泥稳定砂砾基层质量控制要点、施工方法和工艺,具备了进行全线基层施工的条件。现将试验施工情况总结如下
问题补充: |
|
2013-05-23 12:21:38
To ensure the Cement Stabilized Base (hereinafter referred to as primary) base construction quality to accelerate the progress of construction to provide for the full range of grass-roots basis and feasibility of construction quality control program, I project in accordance with the Ministry of high
|
|
2013-05-23 12:23:18
正在翻译,请等待...
|
|
2013-05-23 12:24:58
In order to guarantee the cement stabilization basic unit (hereafter refers to as basic unit) the quality to speed up the basic unit construction progress, is the entire line basic unit construction provides the quality control basis and the feasible construction plan, my project department makes wr
|
|
2013-05-23 12:26:38
To ensure that the cement stabilized base course (hereinafter referred to as grass-roots level) quality accelerated construction schedule, all evidence and feasibility for construction quality control for construction scheme, gist of our project Department according to their superiors, according to
|
|
2013-05-23 12:28:18
|