|
关注:1
2013-05-23 12:21
求翻译:由于可能会用原井架基础代替部分桩基,为加快处理工期,同时建议对现承台下方混凝土的抗压强度进行检测。是什么意思?![]() ![]() 由于可能会用原井架基础代替部分桩基,为加快处理工期,同时建议对现承台下方混凝土的抗压强度进行检测。
问题补充: |
|
2013-05-23 12:21:38
May will be the original derrick basis instead of part of the pile, also recommended to speed up the processing period, now bearing units below the concrete compressive strength testing.
|
|
2013-05-23 12:23:18
Because the original derrick basis may be used instead of Part, piling for 2006 4 to expedite the processing of the current contractor, with the recommendation that the audience of the concrete compressive strength test.
|
|
2013-05-23 12:24:58
Because possibly can use the original derrick footing to replace the partial pile foundations, for speeds up the processing time limit for a project, simultaneously suggested to presently receives underneath Taiwan the concrete compressive strength to carry on the examination.
|
|
2013-05-23 12:26:38
Since the Foundation may use the original Derrick instead of piles, to speed up the processing duration, and recommended on the bottom for bearing platform concrete of compressive strength test.
|
|
2013-05-23 12:28:18
null
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区