|
关注:1
2013-05-23 12:21
求翻译:Before construction starts, the general contractor orders a survey to be made of adjacent structures and terrain, both for the record and to become knowledgeable of local conditions. A survey is then made to lay out construction.是什么意思? 待解决
悬赏分:1
- 离问题结束还有
Before construction starts, the general contractor orders a survey to be made of adjacent structures and terrain, both for the record and to become knowledgeable of local conditions. A survey is then made to lay out construction.
问题补充: |
|
2013-05-23 12:21:38
开始施工前,总承包商的订单,既为记录,并成为当地条件的知识,将相邻结构和地形的调查。一项调查显示,然后奠定了建设。
|
|
2013-05-23 12:23:18
在工程开始时,总承包商的订单统计调查,将作出毗邻的结构和地形,对记录和成为有见识的当地条件。 一项调查,然后订出建筑。
|
|
2013-05-23 12:24:58
在建筑开始之前,将军承包商定购勘测正式记录在案由毗邻结构和地形制成,和变得博学地方情况。 勘测然后被做计划建筑。
|
|
2013-05-23 12:26:38
建设启动之前,总承包商的订单地形,两者的记录和相邻结构作出,并熟悉当地情况的调查。然后进行一项调查,建设的布局。
|
|
2013-05-23 12:28:18
null
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区