当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:As the building rises, pipes, ducts, and electric conduit and wiring are installed. Then, permanent floors, exterior walls, and windows are constructed. At the appropriate time, permanent elevators are installed. If required, fireproofing is placed for steel framing. Next, fixed partitions are built and the roof and it是什么意思?

待解决 悬赏分:1 - 离问题结束还有
As the building rises, pipes, ducts, and electric conduit and wiring are installed. Then, permanent floors, exterior walls, and windows are constructed. At the appropriate time, permanent elevators are installed. If required, fireproofing is placed for steel framing. Next, fixed partitions are built and the roof and it
问题补充:

  • 匿名
2013-05-23 12:21:38
随着建筑物的升高,管道,管道,电管道和布线安装。然后,永久地板,外墙和窗户的构造。在适当的时候,永久电梯安装。如果需要的话,放在钢框架防火。建下,固定分区和屋顶和其覆盖,或屋顶,落实到位。
  • 匿名
2013-05-23 12:23:18
作为建设的上升、喉管、导管、电力等渠道和电线都是安装。 然后,永久层、外墙和Windows是建造。 在适当的时候,永久电梯安装的。 如果需要,防火是放置,钢架。 下一步,固定分区都建立和屋顶和其涵盖,或屋顶,在实行。
  • 匿名
2013-05-23 12:24:58
当大厦上升,安装管子、输送管和电输送管道和接线。 然后,永久地板、外墙和窗口被修建。 在适当的时候,安装永久电梯。 如果必须,耐火为钢构筑被安置。 下,固定的分开被修造和屋顶和它的覆盖物,或者顶房顶,放在适当的位置。
  • 匿名
2013-05-23 12:26:38
由于安装了建设上升、 管道、 管道中,电缆和电力管道和布线。然后,建造永久性楼层、 外墙和窗口。在适当的时候,安装永久的电梯。如果需要,防火钢架的放置。内置下一、 固定的分区中,屋顶及其覆盖或屋面、 到位。
  • 匿名
2013-05-23 12:28:18
null
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

关 闭