|
关注:1
2013-05-23 12:21
求翻译:可以通过研究打桩过程中桩侧超静孔隙水压力的变化,推导桩基承载力的变化,结合实测曲线方法得到的初始桩基承载力,从而得到桩基极限承载力。是什么意思? 待解决
悬赏分:1
- 离问题结束还有
可以通过研究打桩过程中桩侧超静孔隙水压力的变化,推导桩基承载力的变化,结合实测曲线方法得到的初始桩基承载力,从而得到桩基极限承载力。
问题补充: |
|
2013-05-23 12:21:38
Can pile in the piling process through the study of excess pore water pressure changes, the derivation of the change of the pile foundation, combined with the measured curves approach the initial pile foundation, resulting in the pile ultimate bearing capacity.
|
|
2013-05-23 12:23:18
正在翻译,请等待...
|
|
2013-05-23 12:24:58
May cut in line in the process through the research the pile side ultra static pore-water pressure change, the inferential reasoning pile foundation supporting capacity change, the initial pile foundation supporting capacity which the union actual curve method obtains, thus obtains the pile foundati
|
|
2013-05-23 12:26:38
Through research on piles statically piling process variation of pore water pressure, derivation of bearing capacity of pile foundation changes, combined with the observed curve method of bearing capacity of pile foundation of initial, resulting in ultimate bearing capacity of pile.
|
|
2013-05-23 12:28:18
null
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区