当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:the construction method selected by the designer for a highway structure to be built underground in the hyper centre of the city of Toulon is the mechanical precutting with pre-vault, in full section developed choice of tunnel digging in soft and water bearing ground under different types of buildings and foundation.是什么意思?

待解决 悬赏分:1 - 离问题结束还有
the construction method selected by the designer for a highway structure to be built underground in the hyper centre of the city of Toulon is the mechanical precutting with pre-vault, in full section developed choice of tunnel digging in soft and water bearing ground under different types of buildings and foundation.
问题补充:

  • 匿名
2013-05-23 12:21:38
由设计师选择在土伦市超中心地下要建一条高速公路结构的施工方法是在软,含水地面挖隧道全断面选择,根据不同类型的坑前的机械预切开建筑物和基础。
  • 匿名
2013-05-23 12:23:18
的建筑方法选定的结构设计为一项公路将建在地下的超市的中心是土伦的机械precutting与前vault,在充分科制定了选择隧道的挖掘在软和水下地面不同类型的建筑物和基础。
  • 匿名
2013-05-23 12:24:58
设计师选择的建筑方法为高速公路结构被修造地下在市的亢奋中心Toulon是机械precutting与前穹顶,在充分的部分隧道开掘在软性的被开发的选择和水轴承被研在大厦和基础之下的不同的类型。
  • 匿名
2013-05-23 12:26:38
公路结构的设计器,建在地下的土伦市的超中心由所选的施工方法是 pre vault,开发的全断面巷道掘进软和水轴承地面下不同类型的建筑物和基础选择与机械 precutting。
  • 匿名
2013-05-23 12:28:18
建设地下的
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭