当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:A moderate level of initial investment cost for technology is required for the contractors to integrate the EBPPS into their systems. Using this technology, however, will quickly reduce costs and will result in a substantial increase in the speed and accuracy of the bid proposal procedure.是什么意思?

待解决 悬赏分:1 - 离问题结束还有
A moderate level of initial investment cost for technology is required for the contractors to integrate the EBPPS into their systems. Using this technology, however, will quickly reduce costs and will result in a substantial increase in the speed and accuracy of the bid proposal procedure.
问题补充:

  • 匿名
2013-05-23 12:21:38
中等水平的初始投资成本的技术要求承建商融入系统ebpps。然而,使用这种技术,将迅速降低成本,并会导致在投标报价过程中的速度和精度大幅增加。
  • 匿名
2013-05-23 12:23:18
最初的投资成本的适度水平所需的技术是承建商将ebpps纳入其系统。 使用这种技术,然而,很快就会减少费用,将使大量增加的工作的速度和准确性的招标程序。
  • 匿名
2013-05-23 12:24:58
最初的投资成本的一个适度水平为技术为承包商要求集成EBPPS他们的系统。 使用这技术,然而,将迅速减少费用,并且导致在投标报价书做法的速度和准确性的坚固增量。
  • 匿名
2013-05-23 12:26:38
要求承建商要集成到他们的系统的 EBPPS 初始投资成本为技术中的度。使用这种技术,不过,很快将会减少成本,将导致大量增加的速度和准确性的招投标提案程序。
  • 匿名
2013-05-23 12:28:18
null
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭