当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:设计完善后,项目工程师准备好所有须开模具之零部件(五金,塑胶,压铸,硅胶)图纸,并经工程组长校队审核后,申请开模并跟进模具进度是什么意思?

待解决 悬赏分:1 - 离问题结束还有
设计完善后,项目工程师准备好所有须开模具之零部件(五金,塑胶,压铸,硅胶)图纸,并经工程组长校队审核后,申请开模并跟进模具进度
问题补充:

  • 匿名
2013-05-23 12:21:38
Well-designed, the project engineer ready to be open to mold parts (metal, plastic, die casting, silica gel) drawings, and audit by the project head of the school team, the application of the mold and follow up the mold progress
  • 匿名
2013-05-23 12:23:18
Well-designed after all, the project engineers are ready to be the mold of parts and components (5 gold, die-casting, plastic, silicone) drawings, and the project team leader school examination, application and mold and follow-up mold progress
  • 匿名
2013-05-23 12:24:58
After the design consummation, project engineer prepares to have all to open spare part of the mold (hardware, revertex, compression casting, silica gel) the blueprint, and the school team verifies after project group leader, applies to operate the mold and to follow up the mold progress
  • 匿名
2013-05-23 12:26:38
After well-designed, project engineers ready to all parts of the mold (metal, plastic, die-cast, silica gel) drawings, and endorsed by the head of the engineering school after the audit team, progress made in the application for opening and following up the stencil
  • 匿名
2013-05-23 12:28:18
null
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭