|
关注:1
2013-05-23 12:21
求翻译:项目工程师组织将合格模具生产之零部件,进行必要的表面处理(客户要求)后,提交样板组,由样板组试装试模样板给客户确认产品设计及进行相关认证证书之申请。如果客户或测试机构对样板提出修改建议,则重复5.11,5.12,直到客户及测试机构对样板完全认可。5.13投产准备是什么意思? 待解决
悬赏分:1
- 离问题结束还有
项目工程师组织将合格模具生产之零部件,进行必要的表面处理(客户要求)后,提交样板组,由样板组试装试模样板给客户确认产品设计及进行相关认证证书之申请。如果客户或测试机构对样板提出修改建议,则重复5.11,5.12,直到客户及测试机构对样板完全认可。5.13投产准备
问题补充: |
|
2013-05-23 12:21:38
Project engineer organizations qualified mold parts, the necessary surface treatment (customer requirements), submit a model group, and test equipment test appearance board to the customer to confirm the product design and application for certification by the Pilot Group. If the client or the testin
|
|
2013-05-23 12:23:18
Project engineers will be qualified mold production of parts and components, as well as the necessary surface treatment (customer requirements) model, to be submitted to the Group, the Pilot Group trial installation test looks to the Customer on product design and the associated recognition certific
|
|
2013-05-23 12:24:58
Project engineer organizes spare part of the qualified mold production, after carries on the essential surface treat
|
|
2013-05-23 12:26:38
Project engineer organization of qualified mold parts, make the necessary surface treatment (customer request), submitted a model group, the model group have installed try to confirm certificate of product design and related applications. If the customer or the testing agency to the model suggest am
|
|
2013-05-23 12:28:18
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区