|
关注:1
2013-05-23 12:21
求翻译:All identified hazards and their initiating causes are listed together with the risk evaluation, implementation and verification of risk control measures, and the assessment that the residual risk is acceptable according to the risk acceptability outlined in the Risk Management Plan.是什么意思? 待解决
悬赏分:1
- 离问题结束还有
All identified hazards and their initiating causes are listed together with the risk evaluation, implementation and verification of risk control measures, and the assessment that the residual risk is acceptable according to the risk acceptability outlined in the Risk Management Plan.
问题补充: |
|
2013-05-23 12:21:38
列出所有已确定的危害及其发起的原因连同风险评估,实施和风险控制措施的验证和评估,根据风险管理计划中列出的风险可接受的残余风险是可以接受的。
|
|
2013-05-23 12:23:18
所有已确定危害及其发起根源是一起上市的风险评估、执行和核查的风险控制措施,和有关的残余风险评估,是根据可接受的风险所概述的可接受性的风险管理计划。
|
|
2013-05-23 12:24:58
所有辨认的危险和他们创始的起因与危害度评价是列出的、风险管理措施的实施和证明一起和评估残余的风险根据在风险管理计划概述的风险可接受性是可接受的。
|
|
2013-05-23 12:26:38
所有确定的危害和他们发起的原因列出连同风险评估、 实施和风险控制措施的验证和残余风险是可以接受的风险管理计划中所概述的风险承受能力根据的评估。
|
|
2013-05-23 12:28:18
c.这两类导致低风险 (请注意这不定义为可接受的风险)
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区