求翻译:During the construction of crushed stone layers, the Contractor shall take samples and carry out tests under supervision of the Engineer as specified in Section 2. As frequently as the Engineer shall request, but at least once for every 500 m2 of crushed stone material laid the Contractor shall determine the particle 是什么意思?

待解决 悬赏分:1 - 离问题结束还有
During the construction of crushed stone layers, the Contractor shall take samples and carry out tests under supervision of the Engineer as specified in Section 2. As frequently as the Engineer shall request, but at least once for every 500 m2 of crushed stone material laid the Contractor shall determine the particle
问题补充:

  • 匿名
2013-05-23 12:21:38
碎石层的施工期间,承包商应采取样品和工程师的监督下进行第2条指明的测试。经常工程师应要求,但至少一次为每500平方米的碎石材料奠定了承包人应当确定的粒度分布和压实材料的可塑性指数。承包商也应开展其他任何测试和当工程师的要求,以确认符合规范13.3条要求的石材。
  • 匿名
2013-05-23 12:23:18
在施工的碎石层,承包者应采取样本进行测试和监督下的工程师的2条所指明的。 作为经常的工程师应要求,但至少一次,每500m2的碎石材料奠定了承建商须确定的粒度分布和可塑性指数的压缩的材料。
  • 匿名
2013-05-23 12:24:58
在被击碎的石层的建筑期间,承包商在第2部分将采取样品并且执行测试在工程师的监督下如指定。 为每500 m2被击碎的石材料曾经一样频繁地,象工程师将请求,但至少放置了承包商将确定变紧密的材料的颗粒大小分布和可塑性索引。 承包商在规格的条目也将完成所有其他测试,当由工程师要求为了证实石材料的服从以要求13.3时候。
  • 匿名
2013-05-23 12:26:38
石碎石层的施工,承建商不得采取样品、 测试第 2 节中指定作为工程师的监督下进行。作为频繁,工程师应要求,但至少一次碎石每 500 平方米的粒度分布和压实材料的塑性指数决定奠定了承建商的材料。承办商亦须执行出任何其他测试作为和工程师所要求的以便确认石材遵守在子句 13.3 规范的要求。
  • 匿名
2013-05-23 12:28:18
最低干密度 (%MDD) (航路 S1)
 
 