|
关注:1
2013-05-23 12:21
求翻译:The crushed-stone base shall be primed as soon as possible and, where so ordered by the Engineer, traffic may have to be routed across completed and primed layers as specified in Section 16.3.5.是什么意思? 待解决
悬赏分:1
- 离问题结束还有
The crushed-stone base shall be primed as soon as possible and, where so ordered by the Engineer, traffic may have to be routed across completed and primed layers as specified in Section 16.3.5.
问题补充: |
|
2013-05-23 12:21:38
碎石基地应尽快催芽,其中工程师下令,交通可能要跨完成,底漆层的路由在第16.3.5条指明。
|
|
2013-05-23 12:23:18
压碎的石基应尽快准备好,并在如此命令的工程师、交通可能必须为单程跨越完成和装设起爆炸药层16.3.5条所指明的。
|
|
2013-05-23 12:24:58
击碎石头基地将尽快填装,并且,由工程师的地方如此命令,交通在第16.3.5部分也许必须横跨完整和填装的层数寻址如指定。
|
|
2013-05-23 12:26:38
碎石基层须尽快引物和如此工程师的命令,如交通可能要就 16.3.5 节中所指定的已完成和引物层之间进行路由。
|
|
2013-05-23 12:28:18
最低干密度 (%MDD) (航路 S1)
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区