|
关注:1
2013-05-23 12:21
求翻译:安装前要进行试压检验,符合要求方可安装。是什么意思? 待解决
悬赏分:1
- 离问题结束还有
安装前要进行试压检验,符合要求方可安装。
问题补充: |
|
2013-05-23 12:21:38
Inspection and pressure test prior to installation to meet the requirements before installing.
|
|
2013-05-23 12:23:18
Before you install a pressure test to verify compliance with requirements, and can be installed.
|
|
2013-05-23 12:24:58
The handwheel cannot make the hoisting up to use
|
|
2013-05-23 12:26:38
Before installing to try pressure testing, to meet the requirements before they can be installed.
|
|
2013-05-23 12:28:18
视镜
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区