求翻译:When taking active control of grid power flows it is essential to monitor them very carefully and to develop a complete understanding of how the system will behave under all circumstances. This is where ABB’s wide area monitoring system (WAMS) technology comes in.recently, lack of computing power, combined with the sub是什么意思?

待解决 悬赏分:1 - 离问题结束还有
When taking active control of grid power flows it is essential to monitor them very carefully and to develop a complete understanding of how the system will behave under all circumstances. This is where ABB’s wide area monitoring system (WAMS) technology comes in.recently, lack of computing power, combined with the sub
问题补充:

  • 匿名
2013-05-23 12:21:38
采取主动控制电网时,流量是必须非常仔细地监视他们开发的系统将如何表现在任何情况下都完全理解。这是ABB公司的广域监测系统(WAMS)的技术来in.​​recently,缺乏计算能力相结合,在收集大量的困难,协调和同步电网的数据,这不可能。
  • 匿名
2013-05-23 12:23:18
当采取积极控制栅极电源必须监测流动非常认真和他们开发出一套完善的系统将如何如何的理解在一切情况下。 这是abb的广域监控系统(wams)技术产生的.最近,计算能力的缺乏,再加上大量的困难,收集、协调和同步数据的网格本不可能的。
  • 匿名
2013-05-23 12:24:58
当采取栅格功率流活跃控制它是根本非常仔细地监测他们和开发完全理解对怎样系统在所有情况下将表现。 这是ABB的广域监控系统(WAMS)的地方技术在收集,协调和同步做不可能的这的栅格数据来in.recently,缺乏计算能力,结合与坚固困难。
  • 匿名
2013-05-23 12:26:38
采取主动控制的网格电力流动时,必须非常仔细监视他们,并制定一个完整的理解的系统将在所有情况下的都行为方式。这是凡 ABB 公司宽的区域监测系统 (广域测量系统) 技术,来自 in.recently,缺乏的计算能力,加上大量的困难,在收集、 协调和网格的数据同步作出这不可能。
  • 匿名
2013-05-23 12:28:18
As smart grid electric energy meter data acquisition of basic equipment, being intelligent, systematic, modular, and diversification
 
 