|
关注:1
2013-05-23 12:21
求翻译:处理方式:经与基建施工方沟通,将雨水排放管向右接个45度弯头,从而避开电线槽,并于当日完成。是什么意思? 待解决
悬赏分:1
- 离问题结束还有
处理方式:经与基建施工方沟通,将雨水排放管向右接个45度弯头,从而避开电线槽,并于当日完成。
问题补充: |
|
2013-05-23 12:21:38
Approach: communication with the capital construction side, the drainage tube to the right will take a 45 degree elbow, and thus avoid the wire slots on the same day to complete.
|
|
2013-05-23 12:23:18
正在翻译,请等待...
|
|
2013-05-23 12:24:58
Processing mode: After with the capital construction construction side communication, towards right meets the rain water eductor 45 degree bend, thus avoids the wiring duct, and completes in the same day.
|
|
2013-05-23 12:26:38
Approach: by communicating with infrastructure construction, drainage tubes 45 degrees to the right elbow, so as to avoid the wire slot, and finish the day.
|
|
2013-05-23 12:28:18
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区