|
关注:1
2013-05-23 12:21
求翻译:engineers strive for solutions that minimise building costs, within specifications. Set-based approaches may cost more in engineering and building (because, for example, the building is ‘oversized’ to some extent), but save on rework and timeliness. Research should aim at是什么意思?![]() ![]() engineers strive for solutions that minimise building costs, within specifications. Set-based approaches may cost more in engineering and building (because, for example, the building is ‘oversized’ to some extent), but save on rework and timeliness. Research should aim at
问题补充: |
|
2013-05-23 12:21:38
工程师的努力,最大限度地减少建筑成本的解决方案,在规定范围内。基于集的方法可能在工程和建筑成本(例如,因为建设在一定程度上是“超大”),但节省返工和及时性。研究应着眼于
|
|
2013-05-23 12:23:18
工程师争取解决办法,尽量减少建筑成本,得以内。 设置为基础的方法可能费用更在工程和建筑(例如,在建设是“臃肿”在某种程度上),但除关于返工和及时性。 研究应旨在
|
|
2013-05-23 12:24:58
工程师力争使建筑物造价减到最小的解答,在specifi正离子之内。 基于设置的方法也许花费更多在工程学和大厦(因为,例如,大厦在某种程度上是`过大’),但除在重做和实时性之外。 研究应该瞄准
|
|
2013-05-23 12:26:38
工程师努力减少建筑成本,在 specifications 内的解决方案。基于集的方法可能花费更多的工程及建筑 (因为,例如,建筑是 '超大' 在某种程度上),但节省返工和及时性。研究应瞄准
|
|
2013-05-23 12:28:18
工程师争取使大楼费用减到最小的解决方案,在speci fi阳离子内。确定基于接近在工程和大楼花费很多可能(因为,例如,这座大楼' 太大'在某种程度上),但是节省再制和及时。研究计划
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区