当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:建设项目的具体收费标准,根据估算投资额在相对应的区间内用插入法计算.是什么意思?

待解决 悬赏分:1 - 离问题结束还有
建设项目的具体收费标准,根据估算投资额在相对应的区间内用插入法计算.
问题补充:

  • 匿名
2013-05-23 12:21:38
Construction projects of the specific charges, according to the estimated amount of investment in the range corresponding with the insertion method.
  • 匿名
2013-05-23 12:23:18
Construction projects in accordance with the specific criteria for the charges, and estimated the amount of investment in relative should be inserted in the calculation interval.
  • 匿名
2013-05-23 12:24:58
The items of basic construction concrete charge standard, in the sector which corresponds with the interpolation calculates according to the estimate investment cost.
  • 匿名
2013-05-23 12:26:38
Specific charge of the construction project, according to the estimation of investments within the corresponding interval calculation using the Insert method.
  • 匿名
2013-05-23 12:28:18
The concrete expenses standard of the construction project, it is estimated the capital cost is calculated on the corresponding block by inserting the law inside.
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭