当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:锦屏二级水电站引水隧洞埋深大,地应力高,岩爆问题突出,是本工程主要技术难题之一,结合该工程TBM岩爆段施工所遇见的岩爆现象、危害以及防治措施,总结TBM岩爆开挖经验,供类似工程借鉴。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
锦屏二级水电站引水隧洞埋深大,地应力高,岩爆问题突出,是本工程主要技术难题之一,结合该工程TBM岩爆段施工所遇见的岩爆现象、危害以及防治措施,总结TBM岩爆开挖经验,供类似工程借鉴。
问题补充:

  • 匿名
2013-05-23 12:21:38
[object Object]
  • 匿名
2013-05-23 12:23:18
正在翻译,请等待...
  • 匿名
2013-05-23 12:24:58
The beautiful screen two level of hydroelectric power station derivation tunnel burying depth is big, the crustal stress is high, the rock burst question is prominent, is one of this project main technology difficult problems, the knot shoulds the project TBM rock burst section construction to meet
  • 匿名
2013-05-23 12:26:38
Jinping hydropower station diversion tunnel buried deep, high stress and rock burst issues outstanding, is one of the main technical challenges of this project, in conjunction with the project of rock burst in TBM construction met, harms and control measures of rock burst, summary of TBM excavation
  • 匿名
2013-05-23 12:28:18
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭