当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:反铲作业时,必须待臂杆停稳后再铲土,防止斗柄与臂杆沟槽两侧相互碰击是什么意思?

待解决 悬赏分:1 - 离问题结束还有
反铲作业时,必须待臂杆停稳后再铲土,防止斗柄与臂杆沟槽两侧相互碰击
问题补充:

  • 匿名
2013-05-23 12:21:38
Backhoe operation, the arm must be completely stopped before shoveling to prevent arm shank and grooves on both sides hitting each other
  • 匿名
2013-05-23 12:23:18
backhoe operation at par, and must be stopped after his arm again, to prevent doo-byong shovel arm strokes groove on either side with mutual touch click
  • 匿名
2013-05-23 12:24:58
When counter-shovel work, after must wait the arm to stop steadily shovels the earth again, prevented the handle of the Big Dipper and the arm trench both sides strike against mutually
  • 匿名
2013-05-23 12:26:38
Backhoe work, must be arm-bar stopped after shoveling to prevent bucket handle and arm bar grooves on both sides of the mutual impact
  • 匿名
2013-05-23 12:28:18
Against shovel being at homework, must lift soil after the arm pole come to a complete stop, prevent pole cannelure both sides of handle of the Dipper and arm from touch and hit each other
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭