|
关注:1
2013-05-23 12:21
求翻译:2) A clear plan about periodical checks of the safety equipments. First of all give a number to all the devices, and then weekly the person in charge has to check all the equipments, piece by piece, and mark down on the paper if each single device is ok or not. Once every mont we need to open and close the fire hydrant是什么意思? 待解决
悬赏分:1
- 离问题结束还有
2) A clear plan about periodical checks of the safety equipments. First of all give a number to all the devices, and then weekly the person in charge has to check all the equipments, piece by piece, and mark down on the paper if each single device is ok or not. Once every mont we need to open and close the fire hydrant
问题补充: |
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区