当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:支筒内楼板采用后浇法施工,支筒滑模施工时在楼板主钢筋位置安放埋件,后期楼板施工时与主筋焊接是什么意思?

待解决 悬赏分:1 - 离问题结束还有
支筒内楼板采用后浇法施工,支筒滑模施工时在楼板主钢筋位置安放埋件,后期楼板施工时与主筋焊接
问题补充:

  • 匿名
2013-05-23 12:21:38
Support the use of the barrel after pouring slab construction method, tube sliding support during the construction placed in the floor Banzhu buried pieces of steel reinforcement, floor construction and post-weld reinforcement
  • 匿名
2013-05-23 12:23:18
正在翻译,请等待...
  • 匿名
2013-05-23 12:24:58
In after a tube the floor uses the pouring law construction, when tube slip form construction buries in the floor main reinforcement position imposition, later period the floor constructs when and main reinforcement welding
  • 匿名
2013-05-23 12:26:38
Canister later poured floor slab construction, tube sliding formwork construction laid in the floor main reinforcement position when embedded parts, late-floor construction and reinforcing bar welding
  • 匿名
2013-05-23 12:28:18
Prop up floor water law construct adopt, in tube, prop up tube slippery mould main reinforcing bar position lays bury one in floor construct, the anaphase floor is welded with the main muscle while constructing
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭