当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:布置在地板下的电缆、电器、空气等管道及空调系统应在安装地板前施工完毕;是什么意思?

待解决 悬赏分:1 - 离问题结束还有
布置在地板下的电缆、电器、空气等管道及空调系统应在安装地板前施工完毕;
问题补充:

  • 匿名
2013-05-23 12:21:38
Cable under the floor layout, electrical, piping and air conditioning systems, etc. should be installed before construction is completed the floor;
  • 匿名
2013-05-23 12:23:18
Layout of the flooring under such as cables, electrical, air ducts and air-conditioning system should be in before installing the flooring construction has been completed;
  • 匿名
2013-05-23 12:24:58
The arrangement in pipelines and the air-conditioning system and so on under floor electric cable, electric appliance, air should in install in front of the floor to construct finished;
  • 匿名
2013-05-23 12:26:38
Under layout in the floor cable, electrical, air, pipeline and air conditioning systems should be installed in the floor before construction is complete;
  • 匿名
2013-05-23 12:28:18
Cable, electric apparatus, air,etc. pipeline and air-conditioning system that decorate under the floor should construct in front of the floor of installation;
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭