当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:本论文从工程概况、部署管理、现场布置、施工进度计划、施工方案、安全生产 、文明施工与环境保护方面进行了论述,还探讨 了成不控制和质量控制之间的关系。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
本论文从工程概况、部署管理、现场布置、施工进度计划、施工方案、安全生产 、文明施工与环境保护方面进行了论述,还探讨 了成不控制和质量控制之间的关系。
问题补充:

  • 匿名
2013-05-23 12:21:38
This paper from the project overview, deployment management, site layout, construction schedule, construction programs, safety, civil construction and environmental protection aspects are discussed, as also discussed and does not control the relationship between quality control.
  • 匿名
2013-05-23 12:23:18
This paper from an engineering background, deployment management, on-site layout plan and the progress of works, construction programs, production safety, and civilized construction and environmental protection, the exposition is also explored in the Sung does not control the relationship between co
  • 匿名
2013-05-23 12:24:58
The present paper from the project survey, the deployment management, the scene arrangement, the construction progress plan, the construction plan, the safety in production, the civilized construction and the environmental protection aspect has carried on the elaboration, but also discussed has beco
  • 匿名
2013-05-23 12:26:38
This paper from the project overview, deployment management, site layout, construction progress plan, implementation plan, production safety, discusses civilization construction and environmental protection, has also addressed the relationship between control and quality control into.
  • 匿名
2013-05-23 12:28:18
This thesis is from the project overview, dispose and manage, assign live, construction speed plans, construction programme, safety in production, civilized construction have been described with the environmental protection respect, have not also canvassed into the control and relation between the q
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭