当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:Bored cast in situ M 28 grade RCC pile excludingreinforcement complete as per drawing and technicalspecifications 600 and 700 and removal excavated -earth with all lifts and lead up to 1000 m 1500 mm dia pile -是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Bored cast in situ M 28 grade RCC pile excludingreinforcement complete as per drawing and technicalspecifications 600 and 700 and removal excavated -earth with all lifts and lead up to 1000 m 1500 mm dia pile -
问题补充:

  • 匿名
2013-05-23 12:21:38
钻孔灌注桩原位M 28级碾压混凝土桩excludingreinforcement按图纸和technicalspecifications 600和700,并拆除所有升降机出土的地球,并导致高达1000米1500毫米直径的桩完成 -
  • 匿名
2013-05-23 12:23:18
钻孔领衔主演的原地M28年级RCC桩excludingreinforcement完成作为绘画和technicalspecifications600和700和清除挖掘-地球与所有升降机及引至1000M1500mm直径桩-
  • 匿名
2013-05-23 12:24:58
乏味塑像在原处M 28等级RCC堆excludingreinforcement完全根据图画和technicalspecifications被挖掘的600和700和撤除-接地与所有推力并且导致对1000 m 1500毫米dia堆 -
  • 匿名
2013-05-23 12:26:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:28:18
使在原处M 28 等级罗马天主教会堆excludingreinforcement按照画完成和technicalspecifications 600 和700和移动挖掘的投厌烦-有全部电梯的地球并且导致1000米1500毫米dia 堆 -
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭