当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:Trackwork Requirement: The Contractor shall design the viaduct structures in accordance with trackwork requirements. All the structural elements of the viaducts including the locations of expansion joints shall be designed so that they will not interfere with the operation of the trackwork requirement and t是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Trackwork Requirement: The Contractor shall design the viaduct structures in accordance with trackwork requirements. All the structural elements of the viaducts including the locations of expansion joints shall be designed so that they will not interfere with the operation of the trackwork requirement and t
问题补充:

  • 匿名
2013-05-23 12:21:38
操要求:承包者应按照操要求设计的高架桥结构。所有的高架桥结构元素包括伸缩缝的位置应设计,使他们不会干涉操要求的操作和道岔和跨接
  • 匿名
2013-05-23 12:23:18
晨操要求:该承建商须设计的高架道路结构按照晨操要求。 所有的结构因素的高架桥的地点包括扩大接头须设计,使他们不会干预的运作与晨操要求和投票人数和跨3611
  • 匿名
2013-05-23 12:24:58
Trackwork要求: 承包商将设计viaduct结构与trackwork要求符合。 viaducts的所有结构元素包括伸缩接头的地点将被设计,以便他们不会干涉trackwork要求的操作和出席者和天桥
  • 匿名
2013-05-23 12:26:38
Trackwork 要求: 该承建商不得设计按照 trackwork 要求的高架桥结构。所有结构的元素,包括伸缩缝的位置的高架桥的设计须使他们不会干扰 trackwork 要求和道岔及跨旁白的运作
  • 匿名
2013-05-23 12:28:18
Trackwork 要求:订约人将根据trackwork 要求设计高架桥建筑物。包括伸缩接头的位置的高架桥的全部结构构件将被设计,以便他们将不干扰trackwork 要求和出席者和穿过overs的操作
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭