求翻译:当桩端浆泡模量达到某种程度后,桩体和浆泡形成一体,桩的破坏模式由刺入破坏逐渐转变为整体剪切破坏模式。是什么意思? 待解决
悬赏分:1
- 离问题结束还有
当桩端浆泡模量达到某种程度后,桩体和浆泡形成一体,桩的破坏模式由刺入破坏逐渐转变为整体剪切破坏模式。
问题补充: |
|
2013-05-23 12:21:38
When the pile modulus of slurry bubble reached a certain level, the pile and slurry bubble to form one, the failure mode of the pile gradually destroyed by the piercing into the overall shear failure mode.
|
|
2013-05-23 12:23:18
When pile-end pulp modulus of bubbles to a certain extent, piles after integration and slurry bubble forming an integrated whole, pile of destruction by piercing the destruction mode shift pattern overall shear damage.
|
|
2013-05-23 12:24:58
After the tip of pile blister module achieved some kind of degree, the pile body and the blister form a body, the pile destruction pattern by prick the destruction to transform gradually into the whole shearing failure pattern.
|
|
2013-05-23 12:26:38
When the modulus of pile-tip slurry bubble reaches a certain level, piles and slurry bubble forming one, pile failure modes by piercing damage gradually transformed into general shear failure mode.
|
|
2013-05-23 12:28:18
After a end thick liquid bubble modulus becomes a certain, body of a pile and thick liquid bubble form an organic whole, the destruction mode of one is stung and entered destroying and changed into shearing and destroying the mode wholly gradually.
|