求翻译:3.低压配电柜坐落在地沟并沿槽钢支架安装,槽钢支架焊接在地沟基础预埋件上。是什么意思?![]() ![]() 3.低压配电柜坐落在地沟并沿槽钢支架安装,槽钢支架焊接在地沟基础预埋件上。
问题补充: |
|
2013-05-23 12:21:38
3 low-voltage distribution cabinet is located in the trench and install the bracket along the channel, channel steel bracket welded to the trench based embedded pieces.
|
|
2013-05-23 12:23:18
3.Low voltage power distribution cabinet is located along the trench and channel steel stent installed, channel steel bracket welded in Trench Foundation on pre-buried pieces.
|
|
2013-05-23 12:24:58
3. low pressure power distribution cabinet is situated in the place ditch and along the channel steel support installment, the channel steel support welding buries on in advance in the place ditch foundation.
|
|
2013-05-23 12:26:38
3. low-voltage distribution Cabinet is located along the trench and channel steel bracket, grooved steel bracket welded to ditch based on the embedded part.
|
|
2013-05-23 12:28:18
3.Low-voltage switch board located in in underground drainage and install along channel support, channel support weld foundation bury on component in advance in underground drainage.
|