|
关注:1
2013-05-23 12:21
求翻译:高陡的路堑边坡地段,堑坡开挖后可能引起坍塌,设置路堑桩板墙等预加固措施,桩板墙采用钢筋混凝土浇筑是什么意思? 待解决
悬赏分:1
- 离问题结束还有
高陡的路堑边坡地段,堑坡开挖后可能引起坍塌,设置路堑桩板墙等预加固措施,桩板墙采用钢筋混凝土浇筑
问题补充: |
|
2013-05-23 12:21:38
High steep cutting slope lots, cutting slope after excavation may cause collapse, set the pile wall cutting measures such as pre-reinforcement, pouring reinforced concrete pile wall
|
|
2013-05-23 12:23:18
high and steep slope side of the road, their slope paragraph after excavation collapse may give rise to set up their piles, such as wall panels, pre-reinforcement measures reinforced concrete piles used GEM wall pouring
|
|
2013-05-23 12:24:58
Gao Dou the slope of cut land sector, after the moat slope excavates possibly causes caves in, the establishment cuts the pile wooden fence and so on the pre-reinforcement measure, the pile wooden fence uses the reinforced concrete construction
|
|
2013-05-23 12:26:38
High-steep slope of lots in slope excavation may cause collapse, set pre-measures such as cutting sheet pile wall, pile-sheet retaining wall with reinforced concrete
|
|
2013-05-23 12:28:18
The slope location by the high and steep cutting, the slope may cause that collapse after excavating, set up a board of cutting,etc. and strengthen the measure in advance in the moat, a board adopts the armored concrete to build
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区