当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:The first phase of the Yangshan Deepwater Port construction started in the middle of 2002 and was wholly controlled at that time by the state-owned Shanghai International Port Group (SIPG), which oversees all port deals in the municipality. In early 2005, however, SIPG sold a 30% stake in the first phase to another state是什么意思?

待解决 悬赏分:1 - 离问题结束还有
The first phase of the Yangshan Deepwater Port construction started in the middle of 2002 and was wholly controlled at that time by the state-owned Shanghai International Port Group (SIPG), which oversees all port deals in the municipality. In early 2005, however, SIPG sold a 30% stake in the first phase to another state
问题补充:

  • 匿名
2013-05-23 12:21:38
洋山深水港建设的第一阶段在2002年年中开始,当时的全资国有的上海国际港务集团(SIPG),负责全市所有港爱情易控制。然而,在2005年年初,上港集团出售677万美元在第一阶段的30%的股权,另一国有港口运营商,招商局,[20]。第一阶段将于2005年底完成,将看到1600米的岸边,分布在五个深水泊位的年吞吐能力220万标准货柜单位[21]开幕。第一阶段的建设将采取土地面积1.53平方千米,将配备一个72万平方米和15个集装箱起重机的堆场。为洋山深水港工程的第一阶段的投资成本是1.45亿美元的预算
  • 匿名
2013-05-23 12:23:18
第一阶段的准备阶段的Yangshan期租船舶协议的深水港建设2002年开始在中东的和完全控制在当时被国有上海国际港口集团(sipg)负责监督所有港口行程前一刻在该市。 在2005年年初,然而,sipg出售一个30%的股份須事先阶段向另一个国有港口经营商,中国招商,美
  • 匿名
2013-05-23 12:24:58
  • 匿名
2013-05-23 12:26:38
  • 匿名
2013-05-23 12:28:18
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭