当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:水塔上下水管道、照明灯具等的施工均按常规施工方法施工。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
水塔上下水管道、照明灯具等的施工均按常规施工方法施工。
问题补充:

  • 匿名
2013-05-23 12:21:38
Water tower down the water pipes, lighting fixtures and other construction works according to conventional construction methods.
  • 匿名
2013-05-23 12:23:18
water and sewage pipes, lighting towers, such as construction of the conventional method of construction works.
  • 匿名
2013-05-23 12:24:58
About the water tank the water conduct, the illumination lamps and lanterns and so on the construction presses the convention job practice construction.
  • 匿名
2013-05-23 12:26:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:28:18
The construction of water-supply line and sewer pipeline of the water tower, lighting the lamps and lanterns,etc. constructs according to the construction method of the routine.
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭