|
关注:1
2013-05-23 12:21
求翻译:The BFS design is to elevate the Alpha Coal rail above the existing QR line. This will require a large amount of fill for the rail embankments. Another option for consideration during detail design is to put the Alpha Coal Project raill line under the Bruce Highway and QR line which could substantially reduce the earth是什么意思? 待解决
悬赏分:1
- 离问题结束还有
The BFS design is to elevate the Alpha Coal rail above the existing QR line. This will require a large amount of fill for the rail embankments. Another option for consideration during detail design is to put the Alpha Coal Project raill line under the Bruce Highway and QR line which could substantially reduce the earth
问题补充: |
|
2013-05-23 12:21:38
BFS设计,提升现有QR线以上的阿尔法煤炭铁路。这将需要大量的填充一个铁路堤防。详细设计期间审议的另一个选项是把阿尔法煤炭项目raill线下的布鲁斯高速公路和QR线,可以大大减少土方工程的要求和总体成本。排水和施工能力的两个选项将需要在稍后阶段详细研究。
|
|
2013-05-23 12:23:18
黑臉琵鷺覓食的设计是以提升的alpha煤铁线以上的现有QR。 这将需要大量的填补的铁路堤。 另一个考虑选项在详细设计是为了使该Alpha煤项目raill下线的廖成利议员公路和QR线,可大大减少的土方工程要求及整体成本。 排水和可建造性"的两个备选办法将必须加以详细审查在稍后的阶段。
|
|
2013-05-23 12:24:58
BFS设计是举起阿尔法煤炭路轨在现有的QR线之上。 这为路%
|
|
2013-05-23 12:26:38
高炉设计是提升现有的 QR 线以上的 Alpha 煤铁路。铁路路堤,这将需要大量的填充。在详细设计过程中考虑的另一个选项是将 Alpha 煤炭项目 raill 线下的布鲁斯公路与 QR 的线可大幅降低的土木工事要求和总体成本。将需要的排水和施工的这两个选项将在稍后阶段详细看。
|
|
2013-05-23 12:28:18
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区