当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:As engineers advance professionally, they often spend as much or more time on planning, management and other economic or social problems as on the traditional engineering design and analysis problems which form the core of most educational programs. It is upon the ability of engineers to tackle all such problems that t是什么意思?

待解决 悬赏分:1 - 离问题结束还有
As engineers advance professionally, they often spend as much or more time on planning, management and other economic or social problems as on the traditional engineering design and analysis problems which form the core of most educational programs. It is upon the ability of engineers to tackle all such problems that t
问题补充:

  • 匿名
2013-05-23 12:21:38
作为工程师预先专业,他们往往要花规划,管理和其他经济或社会问题,如传统的工程设计和分析问题,形成了大部分教育计划的核心同样多或更多的时间。它是根据工程师的能力来解决所有这些问题,他们的表现将最终判断。
  • 匿名
2013-05-23 12:23:18
作为工程师专业提前,他们往往花去了或更多的时间在规划、管理和其他经济或社会问题,如在传统工程设计和分析问题的核心,大部分教育方案。 它的功能是在所有的工程师都要处理这些问题,它们的表现将最终评判。
  • 匿名
2013-05-23 12:24:58
当工程师专业地推进,他们在计划、管理和其他经济或社会问题上经常花费一样或更多时间象在形成多数教育规划的核心的传统工程设计和分析问题。 它是在工程师的能力应付所有这一类问题他们的表现最后将被判断。
  • 匿名
2013-05-23 12:26:38
专业的工程师在前进,他们经常花作为多个或更多的时间,对规划、 管理和其他经济或社会问题作为传统工程设计及分析问题,构成最教育项目的核心。是工程师,应付他们的表现最终被认定的所有这些问题的能力。
  • 匿名
2013-05-23 12:28:18
作为%
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭