|
关注:1
2013-05-23 12:21
求翻译:本项目位于冉家坝板块上,此板块地势平坦,交通便利。区域内有新南路松石路两条横向主干线,有渝长路、余松路、龙山大道、星光大道四条纵向主干线;同时与内环紧密相连。冉家坝是轨道交通枢扭站,轻轨五号线、轻轨六号线、轻轨线在冉家坝设有两个站点。是什么意思? 待解决
悬赏分:1
- 离问题结束还有
本项目位于冉家坝板块上,此板块地势平坦,交通便利。区域内有新南路松石路两条横向主干线,有渝长路、余松路、龙山大道、星光大道四条纵向主干线;同时与内环紧密相连。冉家坝是轨道交通枢扭站,轻轨五号线、轻轨六号线、轻轨线在冉家坝设有两个站点。
问题补充: |
|
2013-05-23 12:21:38
The project is located Ranjiaba plate, this plate is flat, and convenient transportation. Areas, there are two new Nanlu Song Stone Road, lateral trunk, there is a long way Yu, Yusong Road, Longshan Road, Avenue of four longitudinal trunk; the same time closely connected with the inner ring. Ranjiab
|
|
2013-05-23 12:23:18
This project is located in comparison, as well as home plate, the plate is flat, the transportation is convenient. There is a new South Road in the region two horizontal trunk road matsuishi, Yu Long Road, Yu sung, and the Yongsan Road, avenue road section 4 vertical lines; at the same time with the
|
|
2013-05-23 12:24:58
This project is located on the jan village tectonic plate, this tectonic plate topography is smooth, the transportation is convenient.In the region has the new south road loose rock road two crosswise host skeleton lines, has the Chongqing long road, Yu Songlu, the Mt. Longshan main road, the star l
|
|
2013-05-23 12:26:38
The project is located in Ran Jiaba on a plate, this plate flat, easily accessible. In the region has two horizontal main lines of a new South Pine road, Chongqing Road, Yu Song road, longshandadao, Avenue of stars, four vertical trunk; at the same time closely connected with inner loop. Ran Jiaba i
|
|
2013-05-23 12:28:18
The project is located in Ran Jiaba on a plate, this plate flat, easily accessible. In the region has two horizontal main lines of a new South Pine road, Chongqing Road, Yu Song road, longshandadao, Avenue of stars, four vertical trunk; at the same time closely connected with inner loop. Ran Jiaba i
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区