|
关注:1
2013-05-23 12:21
求翻译:淤地坝,建坝时序,水土流失,相对稳定,防洪安全分析,施工是什么意思? 待解决
悬赏分:1
- 离问题结束还有
淤地坝,建坝时序,水土流失,相对稳定,防洪安全分析,施工
问题补充: |
|
2013-05-23 12:21:38
Dam, dam timing, soil erosion, relative stability, flood control, security analysis, construction
|
|
2013-05-23 12:23:18
In silt, dam construction, as well as timing, soil erosion, and flood control, relative stability, and security analysis project
|
|
2013-05-23 12:24:58
The silt arrester, constructs the dam succession, the soil erosion, relatively stable, flood prevention safe analysis, construction
|
|
2013-05-23 12:26:38
Check dam, dam construction time, soil erosion, relatively stable, flood control and safety analysis, construction
|
|
2013-05-23 12:28:18
silt, dam construction, as well as to timing, soil erosion, flood control, relative stability, and security analysis works
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区