|
关注:1
2013-05-23 12:21
求翻译:在此基础上,确定了系统的总体设计方案,并对载波同步环路的主要模块进行了设计。是什么意思? 待解决
悬赏分:1
- 离问题结束还有
在此基础上,确定了系统的总体设计方案,并对载波同步环路的主要模块进行了设计。
问题补充: |
|
2013-05-23 12:21:38
On this basis, to determine the overall design of the system, the main module and carrier synchronization loop design.
|
|
2013-05-23 12:23:18
On this basis, determine the overall system design and the carrier synchronization loop the main module has been designed.
|
|
2013-05-23 12:24:58
In this foundation, had determined the system overall project design, and has carried on the design to the carrier synchronization ring circuit main module.
|
|
2013-05-23 12:26:38
On that basis, determines the overall design of the system, and on the main module for the design of carrier synchronization loops.
|
|
2013-05-23 12:28:18
on the basis of this, determine the overall system design program, and the carrier synchronization loop the main module has been designed. ;
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区