|
关注:1
2013-05-23 12:21
求翻译:以北京地铁轨道交通10号线轨道道床施工实例,讲解钢弹簧浮置板道床施工工艺。对浮置板中施工应注意的问题进行分析,并提出解决的办法。是什么意思? 待解决
悬赏分:1
- 离问题结束还有
以北京地铁轨道交通10号线轨道道床施工实例,讲解钢弹簧浮置板道床施工工艺。对浮置板中施工应注意的问题进行分析,并提出解决的办法。
问题补充: |
|
2013-05-23 12:21:38
Beijing Metro Rail Transit Line 10 Track Bed Construction instance, explain the process of steel spring floating slab track bed construction. Floating slab construction should be noted that the analysis and propose solutions.
|
|
2013-05-23 12:23:18
正在翻译,请等待...
|
|
2013-05-23 12:24:58
By the Beijing subway track transportation 10 line track bed construction example, explains the steel spring floating plank road bed construction craft.The question the construction should pay attention which to the floating board in carries on the analysis, and proposes solution.
|
|
2013-05-23 12:26:38
Beijing Metro Rail Transit Line 10 rail road bed construction, explaining the construction technology of steel spring floating slab track bed. Floating slab construction should pay attention to problems in analysis, and solution approaches.
|
|
2013-05-23 12:28:18
正在翻译,请等待...
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区