当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:In Ceder et al. (2001) the problem of creating a timetable with maximum synchronization given a network of a fixed route bus service is addressed. This is done with the object to maximize the number of buses simultaneously arriving at the transfer nodes of the network. The problem is formulated as a mixed integer linea是什么意思?

待解决 悬赏分:1 - 离问题结束还有
In Ceder et al. (2001) the problem of creating a timetable with maximum synchronization given a network of a fixed route bus service is addressed. This is done with the object to maximize the number of buses simultaneously arriving at the transfer nodes of the network. The problem is formulated as a mixed integer linea
问题补充:

  • 匿名
2013-05-23 12:21:38
雪松等。 (2001年)创建一个给定的固定路线的巴士服务网络的最大同步的时间表的问题解决。这是通过最大限度地同时在网络的传输节点到达的巴士数目的对象。作为一个混合整数线性规划问题的问题,制定和启发式是用来在多项式时间内解决问题。 fleurent等人(2004年)的工作,并在沃斯(1992),用于二次分配问题的模型同步的问题也解决
  • 匿名
2013-05-23 12:23:18
ceder在etal. (2001年)创建一个时间表的问题,同步在给定网络的最大一条固定路线巴士服务已得到解决。 这是做为对象的巴士数目最大化同时到达传送节点的网络。 这个问题是一个混合整数线性规划问题,并启发式是用来解决在多项式时间的问题。
  • 匿名
2013-05-23 12:24:58
  • 匿名
2013-05-23 12:26:38
信达 et al.(2001 年) 在解决与给予固定的路线的巴士服务的网络的最大同步创建时间表的问题。这是做的要最大化的同时到达的网络传输节点的巴士数目的对象。问题作%E
  • 匿名
2013-05-23 12:28:18
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭