|
关注:1
2013-05-23 12:21
求翻译:在一系列的实地测量、设计计算和查阅相关的技术规范和标准之后,其中我们三人各自计算,最后再慢慢校对,确定无误之后我们三个分开设计。根据相关的标准,我们先在自己的图纸上设计,再反复核对和修改,包括尺寸的修改和钢材的修改。是什么意思? 待解决
悬赏分:1
- 离问题结束还有
在一系列的实地测量、设计计算和查阅相关的技术规范和标准之后,其中我们三人各自计算,最后再慢慢校对,确定无误之后我们三个分开设计。根据相关的标准,我们先在自己的图纸上设计,再反复核对和修改,包括尺寸的修改和钢材的修改。
问题补充: |
|
2013-05-23 12:21:38
In a series of field measurements, design calculations and consult the relevant technical norms and standards, including the three of us their own calculations, and finally slowly proofreading, we determine the correct three separate design. Accordance with the relevant standards, we first design dr
|
|
2013-05-23 12:23:18
In a series of on-site measurements, design calculations, and access to the relevant technical specifications and standards, which we have 3 people in their respective computing, proofing, and then slowly, we have established three separate design. According to the relevant standards, and we have to
|
|
2013-05-23 12:24:58
After a series of on the spot surveys, the design calculation and consult the related technology standard and the standard, in which we three human of respective computations, finally slowly proofread again, after determined unmistakable our three separate the design.According to the related standar
|
|
2013-05-23 12:26:38
In a series of field measurements, design and inspection after the relevant technical norms and standards, which the three respective calculations, and then slowly review, identify and correct us after three separate designs. In accordance with the relevant standards, we design first on his drawings
|
|
2013-05-23 12:28:18
正在翻译,请等待...
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区