当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:For example, the design process should include the identification of risks during the operation and maintenance phase of the asset, including its eventual decommissioning and disposal and taking account of the operating conditions and criticality of the asset.是什么意思?

待解决 悬赏分:1 - 离问题结束还有
For example, the design process should include the identification of risks during the operation and maintenance phase of the asset, including its eventual decommissioning and disposal and taking account of the operating conditions and criticality of the asset.
问题补充:

  • 匿名
2013-05-23 12:21:38
例如,在设计过程中应包括在资产的运行和维护阶段,对风险的识别,包括其最终退役和处置,并考虑到的经营状况和资产的临界。
  • 匿名
2013-05-23 12:23:18
例如,设计过程应包括确定在操作和维护的风险资产的阶段,包括它的最终退役和处置,同时考虑到运行条件和关键性的资产。
  • 匿名
2013-05-23 12:24:58
例如,设计过程应该包括风险的证明在财产的运行和维护阶段期间,包括它最后废除和处置和考虑到财产的操作条件和重要性。
  • 匿名
2013-05-23 12:26:38
例如,设计过程应包括确定风险的资产,包括其最终退役和处置和考虑的运行情况和资产的临界操作和维护阶段。
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭